The protagonists friends from law college, almost but never quite lovers, Kashaf Quaze and Deepak Rana usually find themselves on opposite sides of the law. #Vikramaditya hindi serial movie#Starring Arun Vijay in the lead role, the movie is all set to stream from April 21 onwards in Tamil and Telugu across India. The social drama set on the backdrop of the friendship of a child Arjun and his blind pet dog Simba is a heartwarming display of human-animal bond. #Vikramaditya hindi serial series#Movies, web series releasing from April 21 – 30: The movie was initially released in theatres on March 11, and will be available online in Malayalam, Kannada, Hindi and Telugu languages.Īpart from ‘Radhe Shyam’, here we’ve brought to you all that would stream on Amazon Prime Video in the forthcoming month of April 2022. Directed by Radha Krishna Kumar, the multi-lingual love story is set in Europe in the 1970s. Megastar Amitabh Bachchan has turned narrator for the upcoming Astro-thriller movie. NEW DELHI: India’s lone aircraft carrier 44,500 tonne INS Vikramaditya is undergoing a major refit and is not in operations for more than a year.New Delhi: Superstar Prabhas’s fans would be elated as the much-awaited film ‘Radhe Shyam’, starring Prabhas and Pooja Hegde in the lead roles is all set to stream online on OTT giant Amazon Prime Videos, that too on the first day of April 2022. Meanwhile, with its prowess in manufacturing, China has become the biggest navy with 355 warships and submarines with India having a fleet of 130 of them. If needed, you can move it, bringing a different environment to the battle.” If you have two operationally ready carriers, you can be active in two areas. “Concentration of force is a principle of war. Given the Chinese belligerence in the Indian Ocean, the officers had said that the country will have to extend air power into far-off areas like the Malacca Strait on one side and Gulf of Aden on the other. In such a case availability of three aircraft carriers will give options of deploying one each on the eastern and western seaboard and the third can be put to the maintenance and repair cycle which can stretch up to years. The logic put across is that the country should have at least two active carriers at any given time. The bearings of the shafts were also changed then.Īs reported by TNIE the Indian Navy has been pitching for the third aircraft carrier for a long time. In addition, some work on the shafts - the carrier has four of them, was done. While the previous time the carrier’s hull got treated and painted and a large number of tanks and spaces were also cleaned and painted too. “While the ship was due for refit and maintenance it was kept operational during Galwan as the country needed It.” said the source. Under the maintenance plan since then it was scheduled for a longer maintenance routine to be conducted in 2020 or 2021. The INS Vikramaditya has earlier underwent two refits since it was inducted into the Indian Navy in 2013, with the last one lasting five months and done in 2018 at Cochin Shipyard. The refit time depends on the size and the work required to be done and during this period the boats are out of operation. It will now take an additional few months before it gets deployed for operations, the source added.Ī major fire was reported aboard the carrier on July 20 while undergoing a planned sortie for sea trials as part of the refit and maintenance.Įvery warship and submarine follows a maintenance and refit routine, as per a planned cycle, which ranges from a week-long routine to more than a year. Sources in the defence circle confirmed to this newspaper, “INS Vikramaditya was undergoing an 18-month long refit and maintenance cycle since early 2021 and was expected this month had the fire not occurred.” Its return has been delayed due to the recent fire onboard.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |